Installed the complete electrical and signal system for the new traffic signal at 3000 East & Crimson Ridge. Work included underground conduit installation, pull boxes, service connection, grounding system, and wiring for the signal controller cabinet. Provided power and terminations for signal poles, mast arms, vehicle signal heads, pedestrian heads with ADA pushbuttons, and detection systems. Completed interconnect wiring, testing, programming support, and final commissioning in accordance with city and UDOT standards.